| Project Type | Complete Electrical and Fire Alarm Systems, VDC/BIM |
|---|---|
| Location | North Miami, FL |
Description of Project:
Crystal Lagoons brought its patented technology to Miami for the first crystalline lagoon in the United States: a 10-acre treated-water lagoon at Sole Mia, built on a former EPA Superfund landfill site. Hypower used labor-saving VDC modeling, prefabrication and a GPS Trimble total station to locate and coordinate site utilities accurately, and installed more than 3 miles of conduit and 11 miles of cable to power and control the pumps and filtration systems around the lagoon.
Scope Includes
- All electrical and fire alarm systems
- VDC/BIM
- Temporary electrical requirements
- Equipotential bonding
- Distributed electrical system
- Methane detection and removal system
- Programmable logic controllers
Award: Winner of a 2019 ABC Florida East Coast Chapter Eagle Award for Excellence in Construction.