Project Type | Airfield Services |
---|---|
Location | Miami, FL |
Description of Project
Runway 8R-26L, Taxiways and Cargo Apron Rehabilitation
Scope Includes
- Temporary electric power for (Hypower work forces only)
- Installation of jumper cables, cover edge lights and airfield signs to keep the airfield lights operational
- Electrical demolition of airfield items such as lighting fixtures, base cans, airfield signs, removal of airfield lighting cable and conduits, FAA MALS threshold lights and runway end/threshold lights
- Excavation/Backfill/Compaction for new airfield electrical work
- Concrete and concrete work for airfield electrical ducts where required
- Airfield lighting base cans
- Sign foundation
- MALS light base cans Threshold Bar
- Furnish and install
- New airfield light fixtures and associated wiring and splicing
- New airfield guidance signs and associated wiring and splicing
- Relocation of existing airfield guidance signs and associated wiring and splicing
- Re-paneling of existing airfield guidance signs
- Relocation of constant current regulators at existing airfield lighting vault building
- All electrical quality control testing (performed by our on-site electricians)
Miami International Airport