Project TypeElectrical systems, BIM Coordination
LocationFort Bragg, North Carolina

Description of Project

  • Electrical systems (including low voltage systems, i.e. mass notification, structured cabling, video surveillance, card access) for two new schools, 1 building, housing the Elementary (714 students) and Middle School (550 students)
  • 258,300 sq.ft.
  • Design/Build project

BIM Coordination

  • Level of detail- On this project the MEP&F trades coordinated all ceiling work.
  • Hypower provided the 3D model for all of the electrical devices and equipment in these ceilings which included light fixtures, photo sensors, motion sensors, fire alarm devices, cable tray and conduit over 2″. Hypower also provided the 3D model for all switchgear.
Fort Bragg Elementary and Middle Schools
Year

2012

Client

U.S. Army

Category

EDUCATION, GOVERNMENT