Project Type | Complete Electrical Construction |
---|---|
Location | Miami, FL |
Description of Project
Hypower has installed complete electric services for the Nursing & Health Sciences (NHS) facility which encompasses 115,000 square feet of space housing state-of-the-art interactive skills laboratories, extensive computer suites, specialized training, evaluation, study areas, and lecture hall. It serves all departments of the CNHS: nursing, physical therapy, occupational therapy, communication sciences & disorders, athletic training, health sciences, and health information management. This fast track project was completed on an 18 month schedule involving 24,000 man hours.
Scope Includes
All Division 16 electrical work
- Demolition and relocation of existing site electrical
- Temporary electrical requirements
- Primary electrical service and power
- Lighting
- Fixtures in all areas
- Reroute existing site lighting circuit
- Remove existing light pole
- Complete system of motion control switches
- Switchgear and feeders
- Transformer and ductbank
- Feeders for power distribution equipment
- Surge suppression
- Panels
- Interior lighting and lighting controls
- HVAC disconnects and power wiring
- Telephone/Data/Cable TV System including new ductbank
- Security/CCTV/Card Access Control System
- Lightning Protection System
- Fire Alarm and detection system
- Emergency generator
- 250 kW diesel, weatherproof enclosure
- 1500 gallon sub-base fuel tank

Skanska