PROJECT DETAILS
- Category: Commercial
- Date: 2010
- Size: 36kW
- Type: Building Integrated Photo Voltaic Solar
- ARRA Funded
City of Coral Springs Public Safety Complex and Fire Station 80 Coral Springs, Florida
This project includes a “green” LEED-Certified, 12,400 square-foot Fire Station including four apparatus bays. The facility is the city’s first building seeking LEED Certification. Hypower provided turn-key design and installation for this 36kW Uni-Solar (FlexLite) Thin-Film Amorphous Silicon Solar Photovoltaic System.
Role: PRIME Contractor
- Design Build
- Funded Via the EECBG program
- LEED Certified

























