Download PDF of this Project Profile See This Project on a Map

 PROJECT DETAILS

  • Category: Commercial
  • Date: 2010
  • Size: 24kW
  • Type: Building Integrated Rooftop Solar

Astaldi Construction Corporation Davie, Florida

Hypower Renewable Energy Division recently completed a turn-key, building-integrated, rooftop solar energy system on the ASTALDI Construction Corporation office building in Davie, Florida. The 24kW FlexLight solar photovoltaic system has real-time solar monitoring that measures the environmental offsets generated by the system in tangible terms such as pounds of CO2 or gallons of gasoline. http://www.astaldisolar.com/

Role: As sub contractor Hypower Renewable Energy Division was solely responsible for:

  • Permitting
  • System Design
  • Interconnection
  • System Integration
  • Panel Location
  • Electrical Installation

Latest News
NEWS FROM CITIZENS FOR CLEAN ENERGY
Latest News
FEATURED PROJECT
Lea County 22 MW Solar FarmLea County 22 MW Solar Farm
The project includes the installation of 22 megawatts of utility-tied photovoltaic solar. It's comprised of 80,640 modules mounted on a single-axis tracker.
Learn More
LEARN MORE Close [X]
Comments / Message: