Third Party Commissioning

Too often, operating systems comply with original design intent – yet still do not work well. This can be caused by many factors: elevated sophistication of new energy-efficient building systems, change orders, poor field decisions or designers inexperienced in the practical application of today’s renewable energy technologies.

It is critical to verify that what has been designed is now constructed properly: that is the mission of the commissioning process. It can determine the effectiveness of your system and your ability to meet your long-term goals.

The goal of system commissioning is to ready all mechanical and electrical systems for active service. The process includes: verification of system operation at various conditions; proper interaction between mechanical, electrical and control systems; and documentation when system performance does not meet design criteria. In short, system commissioning takes an active versus a passive approach to guarantee more successful results.

Our staff is highly experienced at commissioning implemented energy conservation measures for proper installation, operation, and efficiency. Our commissioning service helps:

  • Shorten the time it takes to get your project running
  • Ensure that your equipment is installed to manufacturer’s specifications
  • Manage procurement logistics and component quality checks
  • Prevent any problems that could void your warranty
  • Assure you a fully-functional, fine-tuned system that meets your strict EPC, off-taker, lender and other stakeholders’ expectations

Many companies can put up panels. Hypower makes certain your system is not only installed – but properly connected and working at optimum level.

FEATURED PROJECT
HamlinHamlin
Hypower installed the largest building integrated solar photovoltaic system in the Southeastern United States – 107kW.
Learn More
LEARN MORE Close [X]
Comments / Message: