Description of Project:

The project consisted of FPL Duct Bank System around the new City Center in Downtown WPB incorporating a Jack and Bore across FEC railway. The scope included placement of MH’s and conduit for several different utilities (FPL, ATT, Peoples Gas) in downtown West Palm Beach. Hypower Inc. organized a utility consortium to minimize construction in the downtown area by doing a joint trench venture.

Role: Subcontractor- Underground Power Services Division

Completed in 2009



 