City Center & Clematis Garage - West Palm Beach, FL

Description of Project:

The project consisted of FPL Duct Bank System around the new City Center in Downtown WPB incorporating a Jack and Bore across FEC railway. The scope included placement of MH’s and conduit for several different utilities (FPL, ATT, Peoples Gas) in downtown West Palm Beach. Hypower Inc. organized a utility consortium to minimize construction in the downtown area by doing a joint trench venture.

Role: Subcontractor- Underground Power Services Division

Completed in 2009



 

Latest News
TRANSMISSION & DISTRIBUTION WORLD
November 26, 2014 - Microgrids: Fact or Fiction?
Latest News
FEATURED PROJECT
Flagler Memorial BridgeFlagler Memorial Bridge
Hypower’s Underground Power Services Division has completed a 2,500 ft. directional Bore across the Intracoastal Waterway. The project scope also included a 500 ft. trench across Royal Poinciana Boulevard, installation of cable, 2 transformers and switch cabinet in addition to demolition of the existing structure.
Learn More
LEARN MORE Close [X]
Comments / Message: