Seaworld 115 kV Transmission Line Relocation - Orlando, FL

Description of Project:

  • Relocation of existing 115KV Transmission Line
  • Constructed over the top of existing lines
  • Spans were in excess of 850ft long
  • Work was performed at night
  • Structures were 135 ft. tall
  • Removed all the existing lines underneath and cut over the distribution to an underground feed.
  • Foundations were 30ft deep.

Completed in 2008



 