The scope of work consists of an ongoing contract with Winter Park Utilities for 13kV Overhead Distribution 2.5 Miles with .2 Miles of Underground Primary in Winter Park, Florida.
FPL Davis-Perrine Rebuild 3.2 miles of 138kV Transmission Line with single circuit. 1431 ACSR/AW. Rebuild 63 spun concrete poles ranging from 85’ to 100’. Part of the job was built over 13kV distribution.