Robert’s Bay Cable and Directional Bore - Venice, FL
Description of Project:
The project consisted of Directional Bores on each side of the bay incorporated with a Plow performed by Casper Colisimo Construction. The cable was placed via a barge and the splicing was done on the barge and submerged. 1000 MCM copper cable was spliced on barges and submerged.
Role: Subcontractor - Underground Power Services Division.
Completed in 2008





















