Lime Substation Interconnect - Sarasota, FL

Description of Project:

Hypower’s work installing Duct Bank Infrastructure for the City of Sarasota included total 1000 KCMIL Copper Conductor installation in conjunction with an inter-city infrastructure upgrade and Loop Tie between substations. The project consisted of multiple consequential awards over a 2 year span and led to a strong client relationship with FPL.

Role: Prime Contractor - Underground Power Services Group

Completed in 2008

Latest News
TRANSMISSION & DISTRIBUTION WORLD
Latest News
FEATURED PROJECT
Miller Road SubstationMiller Road Substation
Installation and Construction of a new 138kV substation – (4) four 138kV circuit breakers, (17) seventeen 138kV air break switches, (9) nine voltage transformers, control building, metal clad switchgear, etc.