Download PDF of this Project Profile See This Project on a Map

Kennedy Space Center Interconnect Station  – Cape Canaveral, FL

Description of Project: Hypower has completed the 11.4 Megawatts AC Fixed array  solar project on NASA property in Florida. Hypower Bid and  Built the project, partnering with Florida Power & Light  (FPL), the largest solar energy provider in the United  States. Hypower installed  35,000 ground mounted PV  panels.


Hypower’s scope included:

  • Installation of medium voltage (15kV), DC and AC systems
  • Installation and wiring of 37,664 Solar Panels (SunPower 305w)
  • Installation of 15kV switchyards and FPL interconnect.


Substation Scope Included:

  • Sitework
  • Build substation
     

Our Role:

  • Bid Build
     

Date Completed:

  • 2009
Latest News
TRANSMISSION & DISTRIBUTION WORLD
Latest News
FEATURED PROJECT
Midway St. LucieMidway St. Lucie
Hypower Inc., with Air2 Helicopters, replaced Hardware and OPGW fiber optic cable on river towers for FPL. In addition, Hypower installed spacers on bundled conductor, and replaced guys and anchors at various locations.
Learn More
LEARN MORE Close [X]