Download PDF of this Project Profile See This Project on a Map

FPL Davis-Perrine - Homestead, FL

Description of Project:

  • Rebuild 3.2 miles of 138kV Transmission Line with single circuit
  • 1431 ACSR/AW
  • Rebuild 63 spun concrete poles ranging from 85’ to 100’
  • Part of the job was built over 13kV distribution.

Completed in 2009

 

Latest News
TRANSMISSION & DISTRIBUTION WORLD
Latest News
FEATURED PROJECT
Port Everglades DuctbankPort Everglades Ductbank
Redesigned the system and saved the owner $500,000 and tied over 200 cameras together with fiber cable and over 70,000 feet of duct.
Learn More
LEARN MORE Close [X]
Comments / Message: