Download PDF of this Project Profile See This Project on a Map

Ave Maria University Central Energy Plant and Complete Electrical - Ave Maria, Florida

In 2005, Ave Maria was the first Catholic University to be built in the United States in over 40 years. The total project includes 8 buildings.


The Central Energy Plant feeds power to the entire Ave Maria campus, including the Oratory, Student Activities Center, Science, Math, & Technology building, 3 Undergraduate dormitories, Science and Cafeteria Building and the Library.


Scope:

  • Power Generation/Distribution
  • Central Energy Plant
  • Complete Electrical on entire campus

Role: Subcontractor - Power Services Underground

Completed in 2005

Latest News
TRANSMISSION & DISTRIBUTION WORLD
Latest News
FEATURED PROJECT
Palm Coast Design BuildPalm Coast Design Build
Hypower designed, engineered, & constructed a design-build network infrastructure fiber optic cable project for the City of Palm Coast, FL.
Learn More
LEARN MORE Close [X]
Comments / Message: